Oldcastle-buildingenvelope HP-175 User Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 25
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
SEAL CLIP
POCKET AT EACH
END OF BRIDGE
9/16"
GUTTER
TOWARDS
SHOWN BELOW.
SYMMETRICAL, INSTALL AS
CLIPS ARE NOT NOTE:
HP-10 GLAZING CLIPS USED
AT CAPTURED JAMB.
HP-8 CLIPS TO BE USED
AT ALL HORIZONTALS.
INSTALL CLIPS AT A
MAXIMUM OF 12" O.C.
RUN SEALANT ACROSS
FACE OF MULL AND TOP
OF HORIZONTALS
HP175-FP-61 (1")
HP175-FP-68 (1/4")
BRIDGE
REFERENCE SHEET #9
FOR JAMB BRIDGE INSTALLATION
SEAL ACROSS FACE
OF BRIDGE AT
DRIP LEG
1) BED FACE OF MULL
AND TOP OF HORIZONTALS
WITH SEALANT.
2) SET BRIDGE INTO PLACE. HOOK
OVER DRIP LEGS AND ROTATE INTO
PROPER POSITION.
3) SEAL AND TOOL ACROSS
FACE OF MULL AND HORIZONTALS
4) SEAL CLIP POCKET AT EACH END
OF BRIDGE
5) SEAL ABOVE AND BELOW DRIP
LEG OF HORIZONTALS
INTEGRAL DIVERTER HORIZONTAL BRIDGE INSTALLATION
FOR BUTT GLAZE MULLION
H P - 1 7 5 / 2 2 5 I N S T A L L A T I O N M A N U A L
22



Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25

Comments to this Manuals

No comments