FRAME FABRICATION
typ.
Quarter points
D.L.O. minus 1/16"
Roll−Over Head/Sill
D.L.O.
Tubular Horizontal
Midpoint
5/16" dia. weep hole
(bottom leg of face cover)
Typical Face Cover
5/16" dia. weep hole
9" 1 1/2"1 1/2"
1 1/2"
9"
typ.
1 1/2"
D.L.O. minus 1/16"
D.L.O. minus 1/4"
Quarter points
Pressure Plate =
FRAME HEIGHT minus 1/4"
Vertical &
Vertical Face =
FRAME HEIGHT
Pressure Plate
Vertical Face
Factory
punched
holes
Pressure Plate
Factory
punched
holes
1.4 Install and seal mullion caps to top and bottom of all jamb and intermediate vertical mullions with (2)
FS−320 #10 x ½˜ Drive screw. SEE FIGURE 2. Mullion caps at jambs must be modifed. SEE
FIGURE 10, page 8 .
1.5 Fabricate ends of horizontal members for shear block screws, using DJ−113 drill jig. SEE FIGURE
3. Note: When fabricating horizontals, use the side of the drill jig stamped ˆHorizontal˜.
When fabricating head and sill horizontals, use the side stamped ˆHead/Sill/Rollover˜.
FIGURE 1
Material Fabrication Guide
R E L I A N C E − H T C I N S T A L L A T I O N M A N U A L